Material board

Materials decided late are materials decided expensively. Assigning them at schematic stage puts the cost conversation where it belongs — while the design is still cheap to change.

Free for your first 5 plans. No card, no install.

LIVING30.8 m²KITCHEN16.4 m²BEDROOM 0118.0 m²BEDROOM 0213.4 m²11 000

Room by room, not project-wide

Blackbutt in the living space, clay tile in the bathroom, charred cedar outside. Each assignment is tied to a room, so the quantities follow that room's area as the plan changes.

It reaches the renders

The palette is part of the render prompt, so interior and isometric views show the finishes you actually specified rather than a stock interior.

Common questions

Put a plan on the table today

Five plans free. One credit returns four measured options.

Start free